Skip to main content

Building regulations compliance certificate: notifiable work checker

Choose the work being done to see whether it must be notified, who signs it off, which certificate you should end up with and, for self-certified work, the date by which the installer must notify building control.

In England, notifiable building work is signed off either by an installer registered with a competent person scheme, who self-certifies and must give you a building regulations compliance certificate and notify building control within 30 days of finishing, or by building control, which issues a completion certificate. Work listed in Schedule 4, and electrical work other than new circuits, consumer units and work near baths or showers, is not notifiable.

Last reviewed · Building Regulations 2010 (England), regulations 12 and 20, Schedules 3 and 4

Notifiable
Yes
How it is signed off
A registered competent person (electrical scheme) self-certifies, or apply to building control before you start.
What you should receive
Building regulations compliance certificate from the scheme, plus an EIC.
Working
  1. Regulation 12(6A)(b); Schedule 3.
  2. Regulation 20: an installer registered with a competent person scheme must give the occupier a copy of the certificate and notify building control within 30 days of completing the work.
  3. Summary of the Building Regulations 2010 as they apply in England; Wales and Scotland differ. Your building control body has the final say.

A summary, not a ruling: the checker applies the rules quoted in the working, from the legislation listed under Sources. Your building control body, examiner or assessor has the final say on your case. Competence and compliance remain with the user. Not legal advice.

Compliance certificate or completion certificate?

The two routes for notifiable work in England.
Competent person schemeBuilding control
Who signs it offThe registered installer self-certifiesThe local authority or a registered building control approver
Before work startsNothing to submitFull plans application or building notice
Certificate you getBuilding regulations compliance certificateCompletion certificate (local authority) or final certificate (approver)
DeadlineInstaller gives you the certificate and notifies building control within 30 days of completion (regulation 20)Issued after the final inspection
Typical workBoilers, consumer units and new circuits, windows, roof coverings, insulation, solar PV, heat pumpsExtensions, loft conversions, structural alterations, anything a scheme does not cover

Electrical work: when Part P work is notifiable

Only three kinds of electrical work in a home in England are notifiable under regulation 12(6A), listed below. Anything else, such as adding a socket to an existing circuit, is not notifiable but must still be safe and meet Part P, and whoever does it should give you an Electrical Installation Certificate or a Minor Works certificate under BS 7671.

  • Installing a new circuit.
  • Replacing a consumer unit.
  • Any addition or alteration to existing circuits in a special location: the space within 0.6 m of a bath or shower tray up to 2.25 m high (1.2 m from the shower head with no tray), or a room with a swimming pool or sauna heater.

Why the certificate matters

Solicitors ask for building regulations certificates when a home is sold, and a missing one for a boiler, consumer unit or replacement windows can delay the sale. If you have lost one, the scheme the installer belonged to or your local authority can usually provide a copy. Where work was never signed off, you can apply to the local authority for regularisation.

Sources

  • Building Regulations 2010 (SI 2010/2214), regulations 12 and 20 and Schedules 3 and 4, as they apply in England: legislation.gov.uk/uksi/2010/2214, read 18 November 2026.
  • GOV.UK, Competent person scheme: current schemes and how schemes are authorised: gov.uk/guidance/competent-person-scheme-current-schemes-and-how-schemes-are-authorised, read 18 November 2026.
  • Wales has its own version of the 2010 Regulations, with more electrical work exempt; Scotland and Northern Ireland have separate building regulations.

Writing certificates every week? Pro is £39/month ex VAT

  • Every certificate saved: fire alarm, emergency lighting, PAT, EIC, EICR and Minor Works
  • Your logo, company, accreditation and signature on every PDF
  • History with search, copy and re-issue
  • Renewal reminders in the app and in your calendar
  • No “Free version” mark

Business (£79/month ex VAT) adds up to 5 users, a client and site register and bulk reminders. Plans are for businesses (sole traders, partnerships and companies). The forms and calculators stay free.

See plans

Frequently asked questions

What is a building regulations compliance certificate?

A certificate issued through a competent person scheme confirming that a registered installer has self-certified the work as meeting the Building Regulations. The installer must give the occupier a copy and notify building control within 30 days of completing the work.

Do I need a building regulations certificate for a new consumer unit?

Yes. Replacing a consumer unit in a home is notifiable. A registered electrician self-certifies it and you should receive a building regulations compliance certificate plus an Electrical Installation Certificate.

Is a certificate needed for a replacement boiler?

Yes. A Gas Safe registered engineer notifies the work and a building regulations compliance certificate follows. Keep it with the commissioning record and the benchmark or service record.

What if the work was never certified?

Contact your local authority building control. For work carried out without approval, you can apply for a regularisation certificate; they may ask you to open up parts of the work for inspection.

Can I get a reminder before the next date?

Yes, with Pro or Business. Save the record to your account and its next due date appears in your due list and calendar feed. Business also shows it per property in the register.