Skip to main content

Electrical Installation Certificate (EIC)

Complete an EIC for a new installation, addition or alteration with the circuit schedule and test results, sign it on screen and download a PDF. Or download a blank fillable EIC form.

An EIC is issued for new electrical work that includes a new circuit, a new consumer unit or a whole new installation. It records the design, construction, inspection and testing, the supply and earthing arrangements, a schedule of inspections and a schedule of circuit details and test results. For work on an existing circuit without a new circuit, use a Minor Works certificate instead.

Updated · BS 7671:2018 as amended · check against BS 7671 and your scheme

🔒 Filled in and turned into a PDF in your browser. Nothing you type is uploaded unless you press “Save to account”; otherwise a draft stays only on this device.

Client and installation

Designer, installer and inspector

For use where one person is responsible for the design, construction and inspection and testing.

Supply characteristics and earthing arrangements

Particulars of the installation at the origin

Schedule of inspections

Yes = inspected and acceptable; No = not acceptable (do not issue the certificate until corrected); N/A = not applicable; LIM = limitation (explain in the notes).

Intake equipment and service head in sound condition (visual)
Earthing arrangement and main protective bonding in place and labelled
Automatic disconnection: protective devices suit the circuits and fault levels
Additional RCD protection where needed (sockets ≤ 32 A, mobile equipment outdoors, cables in walls, AC final circuits in dwellings)
Arc fault detection considered and fitted where required
Surge protection assessed and fitted where required
Consumer unit / enclosures: suitable, fire-resistant where in a dwelling, IP rating, cable entries sealed
Cables: correct type, routed in safe zones or protected, supported, not damaged
Connections secure; conductors identified; no basic insulation exposed
Isolation and switching devices suitable and accessible
Fire barriers and sealing at penetrations of fire-resisting construction
Separation from non-electrical services and from other systems
Special locations (bath/shower, swimming pool, outdoors, EV, PV) meet their extra requirements
Diagrams, schedules, warning and periodic inspection notices fitted

Distribution board

Schedule of circuit details

One row per circuit. Max Zs is the figure for the protective device; see the maximum Zs calculator on this site.

Schedule of test results

Use the same circuit numbers as the circuit schedule. Ring readings are end-to-end values. Enter “>999” for insulation resistance beyond the meter range and “LIM” where a test was limited.

Test instruments

Signature

Optional. Draw above or pick a PNG/JPG; it stays on your device.

Free PDFs carry a small “Free version” mark. Pro removes it, saves your certificates, adds your logo and company details and reminds you before renewals.

Important: this tool records the results and findings you enter and formats them as a document. It does not inspect, test or assess anything. Competence and compliance remain with the user. Not legal advice.

What this EIC includes

  • Client, installation address, certificate number, extent of the work (new installation, addition or alteration).
  • Designer, installer and inspector details for a single signatory, with scheme registration, departures from BS 7671 and comments on the existing installation.
  • Supply characteristics and earthing arrangements: earthing system, live conductors, U/U0, Ipf, Ze, supply protective device.
  • Particulars at the origin: means of earthing, main switch, earthing conductor and main protective bonding.
  • Schedule of inspections, distribution board details, schedule of circuit details, schedule of test results and test instruments.

How to fill it in

  1. Enter the client and installation details and describe the extent of the work.
  2. Record the supply and origin details. Ze and Ipf are measured at the origin.
  3. Go through the schedule of inspections. Anything marked “No” must be put right before you issue the certificate.
  4. Add one row per circuit to the circuit schedule and the matching row to the test results. Use the maximum Zs and R1 + R2 calculators to check readings.
  5. Sign on screen and press “Download PDF”. Give the original to the person ordering the work.

EIC, Minor Works or building regulations certificate?

The table shows which paperwork to expect. A registered electrician who self-certifies notifiable work must give the occupier a copy of the certificate and notify building control within 30 days of completing the work (regulation 20). Keep the EIC and the compliance certificate together: buyers’ solicitors ask for both.

Which paperwork a homeowner in England should expect for common electrical jobs. BS 7671 sets the electrical certificate; the Building Regulations 2010 decide whether the job is notifiable.
JobElectrical certificate (BS 7671)Notifiable (Building Regulations, England)Building regulations certificate
New circuit (cooker, shower, EV charger, garden supply)EICYes, regulation 12(6A)(a)Compliance certificate via the electrician’s scheme, or building control completion certificate
Replacement consumer unitEICYes, regulation 12(6A)(b)As above
Rewire or new installationEICYesAs above
Extra socket or light on an existing circuit, not near a bath or showerMinor Works certificateNoNone
Alteration within 0.6 m of a bath or shower (special location)Minor Works certificate or EICYes, regulation 12(6A)(c)Compliance certificate or completion certificate

Next inspection date and keeping the EIC

The EIC records the recommended interval to the first periodic inspection, which the designer sets from the type of installation and its use (often 10 years for an owner-occupied home and 5 years for rented homes and commercial premises). In private rented homes in England, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require inspection and testing at least every five years. This form works out the next inspection date from the interval you choose.

Sources

  • Building Regulations 2010 (SI 2010/2214), regulations 12(6A), 12(9) and 20, as they apply in England: legislation.gov.uk/uksi/2010/2214, read 18 November 2026.
  • Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (SI 2020/312): legislation.gov.uk/uksi/2020/312, read 18 November 2026.
  • BS 7671:2018+A3:2024 Requirements for Electrical Installations, Part 6 (inspection and testing) and Appendix 6 (model forms): named as a reference; buy it from the IET.

Writing certificates every week? Pro is £39/month ex VAT

  • Every certificate saved: fire alarm, emergency lighting, PAT, EIC, EICR and Minor Works
  • Your logo, company, accreditation and signature on every PDF
  • History with search, copy and re-issue
  • Renewal reminders in the app and in your calendar
  • No “Free version” mark

Business (£79/month ex VAT) adds up to 5 users, a client and site register and bulk reminders. Plans are for businesses (sole traders, partnerships and companies). The forms and calculators stay free.

See plans

Frequently asked questions

When do I need an EIC rather than a Minor Works certificate?

Use an EIC for a new installation, a new circuit, or replacing a consumer unit. A Minor Works certificate covers additions and alterations to an existing circuit, such as an extra socket or light, that do not include a new circuit.

Does this EIC have three signatures?

This version is for a single signatory responsible for design, construction and inspection and testing, which is the usual case for small contractors. Where different people are responsible, each part needs its own signature; record their details in the notes or use your scheme’s multi-signature form.

Is an EIC the same as a building regulations certificate?

No. The EIC is the electrician’s record that the work was designed, built, inspected and tested to BS 7671. The building regulations compliance certificate confirms the notifiable work was self-certified through a competent person scheme. Notifiable work in a home in England needs both, or a building control completion certificate instead of the compliance certificate.

Who gets the original EIC?

The person ordering the work. The contractor keeps a copy. A landlord should give a copy of the latest electrical report to tenants, and keep the EIC with the property records.

Is this the IET model form?

No. BS 7671 Appendix 6 contains model forms and says what information certificates and reports must contain; schemes and software houses publish their own layouts. This form uses our own layout and wording, based on the model form requirements, and includes the same categories of information. Check that your competent person scheme accepts it before using it for notifiable work.

Who can sign it?

A competent person who carried out (or is responsible for) the work, inspection and testing. The form records what you enter; it does not make the work compliant. For notifiable work in England and Wales (Building Regulations Part P) you also need to notify building control, usually through your scheme.

Is anything I type uploaded?

No. The certificate and its PDF are built by your browser on your device. Nothing you enter is sent to our server; a draft is kept in your browser’s local storage so you can come back to it on the same device, and “Clear form” deletes it.